SectionTitle

report abuse

c58c9-so-s-machines-ventura-aiguaviva-girona-6-

Aiguaviva Industrial Warehouse Rehabilitation

Architect: Rovira Cuyas Architects
Location: Aiguaviva (Spain)
Year of Execution: 2017
Approximate surface: 300 m2
System used: PF-ALT/SO-S

Industrial Warehouse from the 80s built with a metallic structure in the form of structural arches, complemented with pillars formed by UPN's welded on the front to support the horizontal omega profiles intended to support the facade enclosures and with Zeta profiles attached to the arches, for support. of the ceilings, all the enclosure in corrugated sheet.

The Rehabilitation Project consists of radically changing the appearance of the warehouse, for which the interior horizontal metallic structure has been reinforced with consecutive pillars using the same section of the existing profile so that they can support the vertical load of the ceramic cladding of the new design, In the upper part, the double slope is eliminated to make a completely rectangular cladding for the façade using buttresses that will be supported by the Zeta profiles that support the roof. The system used to support the ceramic ensemble is the PF-ALT-TT/SO-S